French reservation shelter restroom remodeling

The restroom buildings at the Skyview and Moraine reservation shelter sites at French Regional Park in Plymouth are being remodeled this fall and during the upcoming winter season.

At both buildings, the core structures and exterior walls will be left in place. The buildings will receive new roofs, siding, interior finishes, drinking fountains and sidewalks. The buildings will be converted from the previous “men’s” and “women’s” multi-stall layout to four individual gender-neutral restrooms in each building. Two restrooms in each building are designed to be fully accessible.

Both restroom buildings will be closed during construction. Work will occur through the winter when both reservation shelter sites are normally closed. Both buildings are expected to reopen in spring 2024.