Baker Campground Trail Resurfacing

Trail resurfacing is taking place on the paved trail within the Baker Campground from September 11 - 14. The sealcoating work requires closure of the affected trail until the material has dried. The trail will be reopened as early as possible once the material is dry, and the entire trail will be open by the weekend. This map shows where work is taking place.